# Design for manufacturing checks we run before a PCB goes to the fab

URL: https://maxlab.io/blogs/2026/pcb-design-for-manufacturing/

> The 12 design for manufacturing checks a PCB gets before the fab, the 4 to 8 week revision loop, and the Gerber, drill, BOM and placement files a fab needs.

Electronics and PCB design · November 2026

#### Design for manufacturing checks we run before a PCB goes to the fab

Design for manufacturing (DFM) for a PCB is the review a finished layout gets before anyone orders boards: does every footprint match its part, can production probe the nets it needs, does the board sit on a panel, can a machine place every part. This essay starts from the six public revisions of our Tokay Lite camera board, walks our twelve pre-fab checks in the order we run them, explains the revision loop that follows the first prototype, and lists the files a fab and an assembly house need.

By Constantine Malynin, hardware manager · Published November 6, 2026

#### Quick answers

1. What is design for manufacturing for a PCB? A check of the finished layout against what a fab can etch and drill and what an assembly line can place and solder, done before the first boards are ordered. More
2. What is on the checklist? Twelve items. The first four are the ones we treat as release gates: footprints, test points, panel layout and machine placement. The other eight are standard layout practice. More
3. Should PCB mounting holes be plated or grounded? Plated if a metal screw or standoff touches them; tied to ground only on purpose, at one point, when the chassis is the ground reference. More
4. How long does a board revision take? Four to eight weeks for a layout pass, a fab run, assembly and bring-up. A simple board often ships on revision two; a camera, radio and charger board usually needs three or more. More
5. What is a Gerber file, and what else does the fab need? A Gerber is one image file per layer of the board. The release package adds the drill file, the pick-and-place file, the bill of materials, the assembly drawing and the fab notes. More
1. 12 checks on the pre-fab list below; the first four gate every release at Maxlab
2. 4–8 wk per board revision: layout pass, fab run, assembly and bring-up
3. 6 revisions of our Tokay Lite camera board, all public on GitHub, rev0 to rev3.2
4. 2–4 wk from a released layout to a handful of assembled prototypes

The repository for Tokay Lite, our ESP32-S3 camera board, has six folders in it: rev0, rev1, rev2, rev3, rev3.1 and rev3.2. The first was committed in March 2023 and the last in March 2024. Each holds a complete KiCad design for the same four-layer, 70 by 70 mm board, and all six are public.

Read in order, the folders are a record of what a year of bench work found, and of what finding it costs. On our projects each board revision is a layout pass, a fab run, assembly and bring-up, and one turn takes four to eight weeks. A mistake corrected while the layout is still on the screen costs about an hour and a fresh export of the files.

So a revision is a slow way to learn anything about a board, and we try to spend one only on what a bench alone can tell us, such as how far the radio reaches beside the real antenna. Whatever a person can catch by reading the layout should be caught there. That reading is the manufacturability check, and ours has twelve items.

#### What does design for manufacturing mean for a PCB?

Design for manufacturing (DFM) is the review of a finished layout against what a fab can etch and drill and what an assembly line can place, solder and test. It happens before anyone orders boards.

The printed circuit board design process runs schematic, part selection, placement, routing, then release. At the end of routing the layout tool runs its design rule check, the DRC, which confirms that no two traces touch, that every clearance meets the number typed into the tool, and that every net is connected.

The DRC compares the layout only with what we typed in. It has no record of the drill sizes the fab uses, how the paste stencil will print, which nozzles the placement machine carries or where the production test fixture will put its probes. A pad 0.2 mm off passes the DRC and fails in the oven. PCB design for manufacturability is the pass that brings those outside facts to the layout. Each of the twelve checks stands in for a machine or a person down the line who will never open the design file.

Why give that pass a stage of its own? Because the price of a mistake rises with every stage a board moves through. On the screen it is an engineer's hour. On the assembled prototype it is a board revision of four to eight weeks. In production it is a reworked or scrapped batch and, in the worst case, units coming back from the field.

The chart draws the common 1-10-100 rule of thumb for that escalation. We have not measured the ratios on our own projects, and they vary with the board, so the bars show the shape of the problem and nothing more exact. That shape is why four of the checks are gates that come before any purchase order, and why our PCB design service lists the manufacturability check as its own stage.

Relative cost of fixing one layout error by the stage where it is found. An illustration of the common 1-10-100 rule of thumb, not measured Maxlab data; the four-to-eight-week revision figure is from our PCB design timeline.

Relative cost of one layout error by the stage where it is found

| Where the error is found | Relative cost (rule of thumb) | What it costs in practice |
| Design review | 1× | An engineer's hour and a new Gerber export |
| First prototype | 10× | A board revision: layout, fab, assembly and bring-up, 4 to 8 weeks |
| Production | 100× | Rework or scrap of a batch, a stopped line, field returns |

#### What is on a PCB design for manufacturability checklist?

Twelve checks, in the order we run them. The first four gate every release at Maxlab: footprints, test points, panel layout and machine placement. The other eight are the PCB design rules any fab or assembly house will hold a board to. The numbered pins on the drawing match the steps.

One board on a two-by-two panel, drawn as a plan: each numbered tag sits where that check lands, and the numbers match the steps.

##### Footprints against the real parts

We start with footprints because the DRC checks a pad against the other pads on the board and never against the part that will sit on it. So every footprint is compared with the drawing in the manufacturer's datasheet, pad by pad: pitch, pad size, pin 1, the thermal pad under a QFN, the courtyard that keeps neighbors away. Library footprints drift from datasheets, and an alternate part on the bill of materials sometimes has a different body. On our boards the comparison starts in KiML, our own KiCad library, where each footprint was built from a datasheet once and reused since.

##### Test points on every net production will probe

Production has to prove each board works before it ships. Every supply rail, the programming interface, the reset line and each signal the test procedure measures needs a pad or via that a probe can reach. We add them during layout, on one side where possible and spaced for a bed-of-nails fixture or a hand probe, and name them TP1, TP2 and so on so the test procedure can refer to them.

##### Panel layout

The assembly line handles a panel, never the single board we drew: an array of boards with rails on two edges for the conveyor, tooling holes in the rails, and V-score lines or tabs with mouse bites where the boards break apart. So the check is made on the panel. No part may sit in the path of the score blade, overhanging connectors go on the free edges, and the panel has to fit the assembler's machines. We ask the assembler for their panel rules before we draw it.

##### Can a machine place every part?

The fourth gate concerns the pick-and-place machine, which needs each part in tape or tray, a flat top a nozzle can hold, and room to set the part down without hitting a neighbor. We walk the bill of materials for parts sold only loose or in tubes, tall parts beside short ones, and anything that would have to be soldered by hand. On a product that ships 2,300 units, as our 12-channel energy monitor has, one hand-placed part is 2,300 manual operations. So we change the part, or move it to a documented hand-assembly step.

##### Clearances and trace widths against the fab's limits

The remaining eight checks follow the board through the fab and back onto the assembly line. Every fab publishes its minimum trace width, spacing, copper-to-edge and copper-to-hole distances. The design rules in the layout tool should have been set to those numbers, or looser, before routing started. This check confirms they were, and that each net carrying current has the width its current needs. Rules tighter than the board needs raise the fab price and lower the yield.

##### Vias and annular rings

A via is a plated hole that carries a signal from one copper layer to another, and the annular ring is the copper left around the hole after drilling. If the drill wanders out of the ring, the connection is unreliable, so the via pads must be large enough for the fab's drill. We also look for vias in surface-mount pads, where they draw the solder away unless filled and capped on purpose, and for a via count out of proportion to the board.

##### Drill table

The drill file lists every hole size on the board, and a fab charges by the number of distinct sizes and by the smallest one. A hole 0.05 mm different from its neighbor costs a tool change and gains nothing. We merge the sizes that can be merged, keep plated and non-plated holes in separate lists, and check each through-hole lead against the clearance its datasheet asks for.

##### Solder mask

After copper and holes comes the coating. Solder mask keeps solder on the pads, and between fine-pitch pads the strip of mask, called the web, must be wide enough for the fab to print. A narrower web disappears, and solder bridges the pins. The check covers an opening on every pad, webs at the fab's minimum, exposed copper where a heat sink or a probe needs it, and no mask over the fiducials.

##### Silkscreen

Silkscreen is read by people. Reference designators, polarity marks and pin 1 dots guide the assembler and whoever repairs the board later. Text may not sit on a pad or a via, because the fab clips it there and what is left is unreadable. Every diode, capacitor and connector with a polarity shows it, and the board carries its name and revision number. Text under the minimum stroke width prints as a smudge.

##### Fiducials

The placement machine reads the board too, with a camera. A fiducial is a bare copper dot with a mask-free ring around it, and the camera finds two or three of them to work out where the board sits and how far it is rotated. We place three on the board in a pattern that is not symmetrical, so the machine cannot read the board upside down, and two more on the panel rails. Copper and silkscreen stay clear of each one.

##### Mounting holes

The corner holes take the screws that hold the board in its enclosure. The check is the hole size against the screw, the keep-out ring under the screw head, and whether the hole is plated and tied to ground. Buyers ask about that last decision most, so the next section takes it separately.

##### Final design rule check and a second pair of eyes

The eleven checks above have moved pads, vias and text, so the DRC runs again with the fab's rules loaded and must come back clean. Then an engineer who did not do the layout opens the exported Gerber files in a viewer and reads them layer by layer. The fab sees only the Gerbers, so a layer turned off during export, or a bottom silkscreen that came out mirrored, shows up here and nowhere else.

In order: footprints, test points, panel, machine placement, clearances, vias, drill table, solder mask, silkscreen, fiducials, mounting holes, final DRC and Gerber read.

#### Should PCB mounting holes be plated or grounded?

Plated if anything conductive touches them. Grounded only on purpose, at one point, when the metal enclosure is the ground reference.

##### Plated

A plated hole has copper on its wall and a pad on both faces of the board. It stands up to a screw being tightened, and it can be connected to a net if we choose. We use one wherever a metal screw, standoff or washer meets the board.

##### Unplated

An unplated hole is bare, with a copper keep-out around it. It suits a plastic enclosure with plastic screws or clips, and any hole that must stay isolated from a metal chassis sitting at a different potential.

##### Grounded

When the enclosure is metal and should sit at the board's ground, we tie one plated hole to ground directly and connect the others through a small resistor or capacitor. With every screw tied directly, current can circulate between the enclosure and the ground plane through several screws.

Like the other eleven checks, this one answers for something outside the layout file, here the enclosure. On Tokay Lite the four corner holes are M3 and the board is sold bare, so the choice sits with whoever puts it in a housing. In a product we design around an enclosure, the enclosure drawing settles it before layout starts: screw size, head diameter and whether the housing is metal are three lines on the requirements sheet.

#### Why does a revision loop add 4 to 8 weeks to the PCB design process?

One turn is four jobs in sequence. The checklist cuts the number of turns. It does not take the number to one, because a board also has to meet requirements that only a bench can test.

##### Layout pass

The findings from the bench go back into the schematic and the layout: a changed part, a moved connector, a wider trace. The twelve checks run again on the result.

##### Fab run

The release package goes to the board house. Bare boards in prototype quantity come back in days to a couple of weeks, depending on the layer count and the service level.

##### Assembly

Parts are placed and soldered from the pick-and-place file and the bill of materials. A handful of assembled boards arrives two to four weeks after the layout was released.

##### Bring-up and test

The board is powered from a current-limited supply and the rails are checked, then each peripheral is brought up in firmware. Sleep current, radio range and thermal behavior are measured, and the list of findings starts the next pass.

Added up, that is four to eight weeks on our projects. A simple board with proven parts often ships on revision two: the first prototype confirms the design and the second carries the small fixes. A board with a camera, a radio and a battery charger usually needs three or more, because each of those blocks has behavior that cannot be checked on a screen: image quality through the real lens, radio range beside the real antenna, charge and sleep currents at real temperatures.

The checklist takes the errors a reader can find and leaves the revisions for the ones only a bench can. Our own Tokay Lite is the example we can show in full, with all six revisions in the public tokay-lite-pcb repository. The differences between one folder and the next are the record of what the bench found that the layout could not. How a board's layer count is chosen in the first place is the subject of our guide to two, four and six layers.

Two habits shorten the loop. We test uncertain blocks on development boards before they go on the custom layout, so the first prototype carries fewer unknowns. And we overlap the stages: long-lead parts are ordered while routing is still under way, and firmware for the known peripherals is written before the first board is back from the fab. The stage-by-stage weeks are in the PCB design timeline, and what each revision costs in engineering hours is covered in our article on PCB design cost.

#### Which Gerber, drill, BOM and placement files go in the release package?

The fab builds the bare board from an image of each layer plus a drill file. The assembly house needs three more files to put parts on it. Together they are the release package.

1. Nozzle head: a flat top a nozzle can hold · check 4
2. Tape feeders: each part in tape or tray · check 4
3. Panel on the conveyor: rails on two edges for the conveyor · check 3
1. Nozzle head: a flat top a nozzle can hold · check 4
2. Tape feeders: each part in tape or tray · check 4
3. Panel on the conveyor: rails on two edges for the conveyor · check 3

Inside a pick-and-place machine, on the line of a factory we work with. The machine never opens the design file: it moves the panel by its rails, takes each part from tape in a feeder and sets it with a nozzle where the pick-and-place file says, which is why checks 3 and 4 are release gates.

A Gerber file is a plain-text image of one layer of the board: top copper, bottom copper, each inner layer, each solder mask, each silkscreen, the paste stencil and the board outline. The fab's software turns the set into the films and tool paths that etch and print the board, and the fab works from those files alone, which is why check 12 ends with someone reading them. Every layout tool exports the format and every fab accepts it. ODB++ bundles the same information, with the netlist and component data, in one archive, and some fabs prefer it because there is less to misread.

The Gerbers say nothing about holes. Those are in the Excellon drill file, which lists each hole's position and size, plated and non-plated separately. The assembly house then needs the pick-and-place file, with each part's reference designator, position, rotation and side. It needs the bill of materials with manufacturer part numbers and approved alternates, and an assembly drawing that shows the designators on an outline of the board so a person can check what the machine did. Whatever is in none of the files goes in the fab notes: layer stack-up, board thickness, copper weight, surface finish, mask color and any tolerance requirement.

We send the same package to the fab whether we are ordering the prototypes or you are. Before production it grows into the full release package described in the PCB design deliverables: the files above, the test procedure that uses the test points from check 2, and the production firmware image.

Files in a PCB release package and who uses each one

| File | What it contains | Who reads it |
| Gerber set (or ODB++) | One image per layer: copper, mask, silkscreen, paste, outline | Fab |
| Drill file (Excellon) | Position and size of every hole, plated and non-plated | Fab |
| Fab notes | Stack-up, thickness, copper weight, finish, mask colour, tolerances | Fab |
| Pick-and-place file | Designator, X, Y, rotation and side for every placed part | Assembly house |
| Bill of materials | Manufacturer part numbers, quantities, approved alternates | Assembly house, purchasing |
| Assembly drawing | Designators on the board outline, polarity marks, hand-assembly steps | Assembly house, inspection |
| Test procedure | Which test point to probe, what to expect, pass and fail limits | Production test |

Go back to the six Tokay Lite folders. No checklist would have reduced them to one, because a camera has to be judged through its lens and a radio beside its antenna, and those findings come back from the bench four to eight weeks at a time. The twelve checks are there so that a wrong pad, an unreachable test point or a mirrored silkscreen does not use up one of those turns. We have not measured what that saves on our own projects. The check is done on the screen, where a fix costs about an hour, and its four gates apply to every layout we release, before any board is ordered.

#### Where this applies at Maxlab

Every layout we release goes through the four gate checks (footprints, test points, panel layout, machine placement) before any board is ordered, as a stage of our PCB design service. Three of our designs have gone through that gate and into production: the solar roof camera at 9,500 units, the 12-channel energy monitor at 2,300 units and the ESP32 Tuya gateway at 1,750 units. The energy monitor in the photo is a board with twelve analog measurement channels and two radios.

If a layout was started elsewhere, we review the files before quoting and tell you what we would change and why. The same checklist applies whether the board is a two-layer sensor node or a Linux camera, and the design files stay yours at the end of every stage. Where a layout tool, or a language model helping with one, can and cannot take over this kind of review is the subject of our article on AI and PCB design.

- Release gates: Footprints, test points, panel, machine placement
- Boards in production: About 122,000 units across more than 20 designs
- Revision loop: 4 to 8 weeks per turn; rev 2 for simple boards, rev 3+ with a camera or radio
- Tools: KiCad or Altium, whichever your team uses

#### Send us the layout before you send it to the fab

Share the schematic, the layout file and the fab you plan to use, or just the block diagram if the board is not drawn yet. We reply within 24 hours with what we would check first.

Tell us about your board

See the PCB design service

Or email hi@maxlab.io or book a 30-minute call.

#### Common questions

###### What is design for manufacturing (DFM) in PCB design?

A review of the finished layout against what the fab can etch and drill and what the assembly line can place, solder and test, done before the first boards are ordered. The layout tool's design rule check proves the board is connected; the DFM review proves a factory can build it in quantity. At Maxlab the four gate checks are footprints against the real parts, test points on every net production will probe, the panel layout and whether every part can be placed by machine.

###### What is a DFM review for a PCB, and who does it?

Someone other than the person who routed the board opens the layout and the exported Gerber files and walks a checklist, usually with the chosen fab's and assembler's published rules beside them. Many fabs also run an automated DFM check on the Gerbers when you upload them. That catches clearance and drill problems; it does not know your parts, your test plan or your enclosure, so it does not replace the engineering review.

###### What are PCB design rules?

The limits a layout must stay inside so the board can be made: minimum trace width and spacing, minimum drill size and annular ring, copper-to-edge and copper-to-hole distances, solder mask web width, and the courtyards that keep parts apart. The fab publishes its numbers; you type them into KiCad or Altium before routing and the design rule check (DRC) flags every violation. Looser rules than the fab's minimum cost nothing and raise the yield.

###### What is a via?

A small plated hole that carries a signal or a supply from one copper layer to another. The copper left around the hole after drilling is the annular ring; if it is too narrow the drill can break out of it and the connection becomes unreliable. A through via runs through the whole board; blind and buried vias stop at inner layers and cost more to make.

###### What is a Gerber file?

A plain-text image of one layer of the board: top copper, each inner layer, bottom copper, each solder mask, each silkscreen, the paste layer and the outline. Every layout tool exports a Gerber set and every fab reads one. It does not contain the holes, which go in a separate Excellon drill file, or the parts, which go in the pick-and-place file and the bill of materials. ODB++ is a newer single-archive alternative that carries all of this together.

###### Should PCB mounting holes be plated?

Yes, if a metal screw, standoff or washer touches the hole. Plating puts copper on the hole wall and a pad on both faces, so the hole stands up to the screw being tightened and can be connected to a net if you choose. Use an unplated hole with a copper keep-out when the hole must stay isolated or when the fastener is plastic.

###### Should PCB mounting holes be grounded?

Only on purpose. If the enclosure is metal and should sit at the board's ground, connect one mounting hole directly to ground and the others through a small resistor or capacitor, so current cannot circulate between the chassis and the ground plane through several screws. If the enclosure is plastic, or the chassis must stay at a different potential, leave the holes off ground.

###### What is the PCB design and manufacturing process, start to finish?

Schematic, part selection, placement, routing, the design rule check, then the manufacturability check described in this article. The release package (Gerbers or ODB++, drill file, pick-and-place file, bill of materials, assembly drawing and fab notes) goes to the fab and the assembler, assembled prototypes come back in two to four weeks, and bring-up on the bench starts. Each later revision is a four-to-eight-week loop of layout, fab, assembly and test. Stage-by-stage weeks are in our PCB design timeline.

###### How many revisions does a PCB usually take?

A simple board with proven parts often ships on revision two. A board with a camera, a radio and a battery charger usually needs three or more, because image quality, radio range and sleep current can only be confirmed on the bench. Our Tokay Lite camera board went through six public revisions, rev0 to rev3.2, between March 2023 and March 2024; all of them are in the tokay-lite-pcb repository.

###### Can you run a manufacturability check on a layout we already have?

Yes. We take over designs started elsewhere and review the files before quoting, so the first thing you get back is the list of what we would change and why. Send the schematic, the layout source (KiCad or Altium) and the fab and assembler you plan to use through the contact page.

#### Related articles

Electronics and PCB design

##### How many PCB layers your board needs

Electronics and PCB design

##### How much does PCB design cost in 2026, and what moves the number